BOOK YOUR POOL OPENING!
Inground Pool Opening Include:
-
Removal of debris and pumping water off from the winter cover
-
Cleaning, folding and removing the winter cover and water bags
-
Scrubbing the water line
-
Re-installing any pool equipment, such as slides, diving boards, and ladders
-
Removal of all winterizing material, such as foam rope, plugs, etc.
-
Re-assembly and inspection of the filtration system
-
System Start (Based on Water Level)
-
Shocking the water with 20L of liquid or granular chlorine
-
Report of Good Repair
-
Includes 2nd visit for maintenance for 1 Hour.
.png)